Join The Discussion

 

Group buys former Armour meatpacking site in Stockyards

The 16.8-acre site of the historic, former Armour meatpacking plant in Fort Worth’s Stockyards has changed hands, and its new owners aren’t saying anything about their plans. Chesapeake Land Development Co., which bought the site

read more >

Social House Fort Worth plans to open mid-November

Social House has leased 5,045 square feet at 2801-2873 W Seventh St. in Fort Worth, according to Xceligent Inc.

read more >

Ski Grand Prairie? TCU, UTA grad helping bring snow to Metroplex

For Levi Davis last week may have been a career peak, in more ways than one.

read more >

GE rises most in year with equipment order increases, including at Fort Worth locomotive unit

NEW YORK — General Electric Co. beat analysts' profit estimates in the third quarter as Chief Executive Officer Jeffrey Immelt squeezed more costs from the manufacturing units.

read more >

Cheesecake Factory gets ready to serve; Sundance tree lighting set

The Cheesecake Factory at Sundance Square will open on Dec. 9, officials with Sundance announced today. The 8,800-square-foot restaurant - being built in the

read more >

GM officially opens new stamping plant in Arlington

Raw sheet metal is stamped into automotive parts at the new General Motors Arlington Stamping plant Monday, October 14, 2013 in Arlington, Texas. GM Arlington’s new contiguous stamping facility represents a $200 million investment in Texas and marks the resurgence of American manufacturing and a commitment to manufacturing excellence within General Motors. (Photo by Mike Stone for General Motors)

The first of three mammoth stamping presses is up and running at General Motors’ newest stamping facility in Arlington. The $200 million contiguous stamping plant, announced in 2012, adds 180 jobs to GM’s Arlington manufacturing complex and is one of 10 contiguous stamping operations globally that started production in the last five years.


The first Arlington-stamped product was a 2014 Cadillac Escalade on display at the site’s official grand opening on Oct. 14 attended by Tim Lee, executive vice president, global manufacturing and chairman, GM China.
“Our stamping team takes GM’s creative designs and makes them a reality, forming metal into shapes that please our customers and define a product’s identity,” Lee said. “They ensure hundreds of metal parts come together to fit snugly, but open and close with ease. And they produce perfectly smooth body panels so our paint shops can apply a pristine coat of paint for our customers.”
The new stamping facility will produce large metal parts, such as doors, hoods and side panels, for the next generation of the full-size SUVs. The Arlington plant is the lone source for Chevrolet Tahoes, Suburbans, GMC Yukons and Cadillac Escalades sold globally.


The Arlington plant today receives stampings from several GM locations, some more than 1,000 miles away. The new stamping facility will save about $40 million in logistics costs each year, according to GM.
“Arlington Stamping is the latest example in GM’s strategy to improve quality and reduce cost,” Lee said. “The money we save can be reinvested in our products and technologies that add value to our customers.”
In January 2012, the city of Arlington approved a 10-year, 90 percent tax abatement for the expansion.


The GM Arlington assembly plant employs over 2,500 workers, most represented by UAW Local 276. An estimated 1,140 SUVs are built there every day. The plant makes the Chevrolet Tahoe, Chevrolet Suburban, GMC Yukon and the Cadillac Escalade vehicles
As part of the stamping plant opening ceremony, GM, the GM Foundation and UAW leaders announced $75,000 in contributions to local charities. - Robert Francis
 

< back

Email   email
hide
Ebola
How worried are you about Ebola spreading?