Join The Discussion

 

Group buys former Armour meatpacking site in Stockyards

The 16.8-acre site of the historic, former Armour meatpacking plant in Fort Worth’s Stockyards has changed hands, and its new owners aren’t saying anything about their plans. Chesapeake Land Development Co., which bought the site

read more >

Fresh Ebola fears hit airline stocks

DALLAS (AP) — News that a nurse diagnosed with Ebola flew on a plane full of passengers raised fear among airline investors that the scare over the virus could cause travelers to avoid flying.

read more >

Social House Fort Worth plans to open mid-November

Social House has leased 5,045 square feet at 2801-2873 W Seventh St. in Fort Worth, according to Xceligent Inc.

read more >

Ski Grand Prairie? TCU, UTA grad helping bring snow to Metroplex

For Levi Davis last week may have been a career peak, in more ways than one.

read more >

GE rises most in year with equipment order increases, including at Fort Worth locomotive unit

NEW YORK — General Electric Co. beat analysts' profit estimates in the third quarter as Chief Executive Officer Jeffrey Immelt squeezed more costs from the manufacturing units.

read more >

Forest Park Blvd. closed (again)

 

Forest Park Boulevard will be closed for 10 days starting Aug. 21 so crews can place deck panels, curbs and other items for the new signature bridge over the existing roadway. Forest Park Boulevard will reopen Aug. 31, weather permitting.
Detours:
• Northbound Forest Park Boulevard motorists will be detoured to eastbound West 10th Street. Motorists will then turn left on Penn Street, left on West Fifth Street and back onto Forest Park Boulevard.
• Southbound Forest Park Boulevard motorists will be detoured to eastbound West Fifth Street. Motorists will then turn right onto Penn Street, right on West 10th Street and back onto Forest Park Boulevard.
The West Seventh Street bridge is a gateway between downtown Fort Worth and its Cultural District, and through a partnership of the City of Fort Worth and TxDOT, a new reinforced concrete “thru-arch” signature bridge will be constructed. TxDOT designed the bridge with six arch spans across the Trinity River to improve safety and pedestrian access, which will add to the architectural redevelopment underway in this corridor.
The original bridge was built in 1913 and was extended in 1953 when the river was rechannelized. Additional project information is available online fortworthtexas.gov/seventhstreetbridge/
 

< back

Email   email
hide
Ebola
How worried are you about Ebola spreading?